This is the end of summer , here just another warm and sunny day.
Thanks to Hurricane Isabel we have had a dry month
Work on the main hull was all taping seams and sealing up cracks and holes. On the main hull the pads for the OR swing wings are on and the Eye bolts have been moved forward as required by the new geometry.
The OR aft bulkhead has been moved and the CA pins are all installed. The deck was cut into sections and is being rearranged and installed.
Recent Comments